Rise of Floor (or Deadrise): The rise of the bottom shell plating line above the base line. This rise is measured at the line of moulded beam.
The distance above the keel that a tangent to the bottom at or near the keel cuts the line of maximum
Rise of Floor (or Deadrise): The rise of the bottom shell plating line above the base line. This rise is measured at the line of moulded beam.
The distance above the keel that a tangent to the bottom at or near the keel cuts the line of maximum